# AEGIS — Implementation Readiness Report - **Document ID:** ARCH-59 - **Phase:** Report — Implementation Kickoff Reference - **Status:** Proposed — awaiting Owner sign-off following ARCH-58 Freeze approval - **Version:** 0.1 - **Date:** 2026-07-10 - **Owner:** Chief Security Architect - **Depends on:** ARCH-01 through ARCH-58 --- ## 1. Purpose Summarize the state of the AEGIS architecture at Freeze and provide the implementation team with the official starting point: the remaining risks, known limitations, architecture debt, verification coverage, recommended implementation order, and recommended security priorities. This document is the handoff from architecture into implementation. ## 2. Executive Summary - **Corpus:** 57 ARCH-* documents + supplementary memory + CLAUDE.md constitution. ~55,000+ words of reviewed, four-reviewer-disciplined architecture. - **Scope:** v0-GA delivers a six-capability Security Brain (Log Collection, Normalization, Correlation, AI Recommendations, Timeline, Audit) on 15 engines mediated by a Security Kernel, with Recovery Domain isolation, capability-based security, and multi-stage decision pipeline. - **Assurance target v0-GA:** Level 3 (Continuous) for critical subsystems; roadmap to Level 5 (Critical) by v3 (year 5). - **Deployment matrix:** 7 reference topologies (VPS through hosted MSSP). - **Governance:** ADR process, five-gate Security Design Review, four-reviewer discipline, Debt Register, Architecture Health Metrics, Trust Score. - **Freeze status:** ARCH-58 recommends approval subject to Owner + Auditor + CSA ceremony. ## 3. Remaining Risks Ordered by consequence: ### 3.1 Architectural Risks (residual, accepted) - **R-1. Prompt-injection through ingested content** (ARCH-03 P-1). Structural mitigations in place (Safety Layer, Multi-Engine Adjudication, evidence citation); residual accepted; monitored via Continuous Adversarial Validation. - **R-2. Kernel formal-verification gap.** TLA+ on Capability Directory scheduled for v1; v0-GA relies on property tests + Watchdog Quorum. - **R-3. Model provenance for L2.** Canary evals + provenance verification + multi-model consensus in place; residual accepted for L2 open-weights. - **R-4. Classical-crypto horizon.** PQC hybrid piloted post-v0-GA; long-lived audit archival is the highest-priority migration target. - **R-5. MSSP hosted multi-tenant complexity.** Deferred to v2; extensive drills before GA. ### 3.2 Operational Risks - **R-6. On-call sustainability at team scale.** Rotation modelling documented; regional rotation deferred to v2. - **R-7. Ceremony discipline decay.** Rehearsals + Auditor + metrics + external audit annual. - **R-8. Verification Matrix population.** Framework complete; per-subsystem rows populated during implementation. ### 3.3 Adversarial Risks - **R-9. Novel attacker classes not yet modeled.** Living-Threat-Model discipline compensates. - **R-10. Supply-chain compromise horizon.** Two-CI reproducibility + SLSA-3+ + hash pinning + transparency log; residual accepted. ## 4. Known Limitations - **L-1. v0-GA scope narrow.** Six capabilities only; deferred: Dashboard, Asset Inventory, Config Review, Risk Scoring, Threat-Intel Correlation, Response Engine execution. - **L-2. IdP protocols in v0.** OIDC only; SAML + SCIM at v1. - **L-3. No endpoint agent in v0.** Log-source ingestion via forwarders only. - **L-4. Plugin runtime interface-only in v0.** Full runtime v0.2. - **L-5. Air-gap topology has L1 + L2 AI only.** L3 forbidden by design. - **L-6. Multi-tenant hosted deferred to v1+.** v0 is single-tenant self-hosted. - **L-7. Response Engine defined but not executing.** Advisory-only through v1. ## 5. Architecture Debt Full Debt Register in ARCH-29. v0-GA entries: | ID | Description | Owner | Target | Mitigation | |---|---|---|---|---| | D-K-01 | Kernel L3 vs. L5 target | Kernel team | v1 | Formal methods + expanded property tests | | D-C-01 | Crypto L3 vs. L5 target | Crypto team | v1.x | PQC hybrid when libraries production-ready | | D-A-01 | AI Safety canary corpus size | Safety team | v0.2 | Grow with operational data + red-team | | D-R-01 | Risk Engine conservative weights (prefer FP over FN) | Risk team | v1 | Operate + measure + refine | | D-P-01 | Plugin runtime v0.2+ | Plugin team | v0.2 | Wasm runtime + governance | | D-O-01 | SAML/SCIM v1 | Identity team | v1 | Post-v0 delivery | | D-D-01 | R-2 Docker Compose minimal coverage | Ops | v1 | Post-v0 expansion | | D-D-02 | MSSP hosted (R-7) deferred | Product | v2 | v1 pilot planning | | D-S-01 | Formal methods post-v0 | Kernel + Cap teams | v1 | Pilot on Capability Directory | | D-O-02 | OIDC-only excludes SAML enterprises | Identity | v1 | v1 delivery | ## 6. Verification Coverage at Freeze - **Verification Strategy** framework complete (ARCH-27 + ARCH-37). - **Verification Matrix** schema defined; rows populated during IRA + implementation. - **Property tests** — 5 Golden Invariants specified (capability attenuation, classification propagation, hash-chain monotonicity, revocation propagation, redaction correctness); to be authored during implementation. - **Threat Simulation Framework** — scenarios library structure defined (ARCH-39); initial corpus authored during implementation. - **CAV Runner** — designed (ARCH-50); implemented during implementation. - **Formal Verification** — Candidate register with 8 candidates + priority ranking (ARCH-40); pilots begin post-v0. - **External Audit** — annual cadence set (ARCH-23); first audit at v0-GA. ## 7. Recommended Implementation Order Phased, security-first sequencing over ~12 months to v0-GA: ### Phase 1 (weeks 1–8): Foundations - Security Kernel core (identity, capability broker, audit gateway, integrity beacons). - Cryptographic Identity substrate (SPIFFE-shape, Ed25519, signing hierarchies). - Root of Trust ceremony infrastructure (Z0). - Storage Engine facade over PostgreSQL + ClickHouse. - Boundary contract enforcement pattern (Kernel-mediated calls). - CI/CD pipeline + two-CI reproducibility + signing hierarchy. ### Phase 2 (weeks 9–16): Ingest + Audit - Connector Engine (syslog + HTTPS push). - Normalization Engine (OCSF baseline). - Immutable Event Sourcing storage patterns. - Layer-A hash-chain audit path. - Layer-B batch archival + signing. - Watchdog Quorum framework (4 watchdogs). ### Phase 3 (weeks 17–24): Detection + Cases - Detection Engine (Sigma). - Case Engine (findings → cases → timelines). - Evidence Engine (provenance + confidence). - Policy Engine (OPA/Rego). - Basic Next.js UI (case + timeline views). ### Phase 4 (weeks 25–32): AI + Safety Layer - AI Engine (three-tier router). - Provider adapters (Qwen local + Claude/GPT/Gemini hosted). - AI Safety Layer (8 deterministic validators). - Multi-Stage Decision Pipeline (11 stages). - Runtime Risk Engine. - Redaction pipeline. ### Phase 5 (weeks 33–40): Recovery + Operations - Recovery Engine + Recovery Domain. - Backup/restore + immutable + air-gap copies. - Metrics collection (ARCH-24 catalog). - Observability dashboards. - Runbooks + on-call setup. - Reference deployment R-3 (Kubernetes small). ### Phase 6 (weeks 41–48): Assurance + v0-GA - Verification Matrix populated per subsystem IRA. - Property tests for all 5 Golden Invariants. - CAV Runner online. - Threat Simulation library initial corpus. - First external red-team engagement. - First external audit. - v0-GA preparation + Release Certification. - Retrofit ADRs published. ## 8. Recommended Security Priorities Build security *ahead of* capability — the opposite of typical product development: 1. **Kernel + Cryptographic Identity + Capability Model FIRST** — foundation for every downstream security property. 2. **Immutable Event Sourcing + Audit Chain SECOND** — evidence is preserved before anything else runs on it. 3. **Storage Engine with tenant scoping THIRD** — data isolation is structural before use. 4. **Boundary contracts + Kernel mediation FOURTH** — enforced pattern before adding engines that rely on it. 5. **AI Safety Layer BEFORE AI Engine value features** — safety before capability, always. 6. **Recovery Domain + backups EARLY** — resilience before scale. 7. **Watchdog Quorum in parallel with Kernel** — integrity monitoring co-develops with Kernel. 8. **Verification instruments continuously** — Property tests + CAV + Threat Simulation grow alongside every implementation phase, never at the end. ## 9. Governance for Implementation - Every subsystem's implementation begins with an approved IRA (ARCH-53). - Every architectural decision during implementation is an ADR. - Every release passes the Certification Checklist (ARCH-54). - Every deployment passes the ORR (ARCH-56). - Debt Register updated continuously. - Weekly ops review; monthly council; quarterly assurance-roadmap review; annual full architecture review. ## 10. Sign-off The Chief Security Architect certifies that this report accurately summarizes the state of the AEGIS architecture at freeze; that the identified risks, limitations, and debt are complete and honestly stated; and that the recommended sequencing is designed to build security into the platform from the first line of code. **Recommendation:** approve this report + ARCH-58 Freeze → implementation begins. ## 11. Future Risks / Known Limitations / Out-of-Scope / Retirement - **Future Risks.** Implementation may reveal architectural gaps; ADR process absorbs. - **Known Limitations.** Snapshot at freeze; state evolves. - **Out-of-Scope.** Detailed engineering plans (owned by implementation team). - **Retirement Conditions.** Report is one-time; supplanted by ongoing Continuous Architecture Review. ## 12. Change Log - **0.1 (2026-07-10)** — Initial draft; awaiting Freeze approval. --- **Signature block (to be completed on approval):** - Chief Security Architect: __________________ - Platform Architect: __________________ - Owner: __________________ - Auditor: __________________ - Report accepted on: __________________ - Implementation may begin as of: __________________